Replacement of an ageing MV substation
Valenciennes area, 2024
- Context
- The incoming substation of a manufacturing site had reached the end of its life and no longer met the grid operator's requirements.
- Work carried out
- Design, removal of the old substation, installation of a new one, connection and commissioning coordinated with the grid operator.