Renovation of a boiler room control system
Valenciennes area, 2026
- Context
- The boiler room of a healthcare facility ran on an outdated control system that was hard to operate.
- Work carried out
- New electrical cabinet with PLC, sensors and valves, connected to the heating network's SCADA system.

